Hey guys,
I'm trying to get my 600V2 ready in time for the zone fun fly on Friday, it's nearly there but the control shaft seems too long for the width of the 2 frames. Ive put on the two aileron levers, and there was quite a sizeable gap each side between the mainframe and the levers. So as the instructions state I used washers to close the gap. I've used all available washers, but there's still movement in the shaft. Is this normal???
Any tips and advice would be much appriciated.
Thanks, Dan
I'm trying to get my 600V2 ready in time for the zone fun fly on Friday, it's nearly there but the control shaft seems too long for the width of the 2 frames. Ive put on the two aileron levers, and there was quite a sizeable gap each side between the mainframe and the levers. So as the instructions state I used washers to close the gap. I've used all available washers, but there's still movement in the shaft. Is this normal???
Any tips and advice would be much appriciated.
Thanks, Dan


Comment