Hi everybody,
This is my first post on here, but have been lurking in the background for some time trying to figure things out for myself and reading posts that are helping me in my struggles.
My query is this......when setting up the thro curves and pitch curves, I set the values as described, eg 0%, 20%, 40% etc for postion 1 to 5, (Got that part)
Then I have to put the HOLD to 0. If the first point says that the pos L=0%, 2=25%, 3=50%, 4=75% and 5=100%.........Do I then have to click and set the position back to L so that the HOLD is back to 0%, or do I set the position to H.......THEN go to HOLD and return all the way back down to 0%?
So I suppose the shorter question would be.............Should the Norm show L for 0% or should it be set to H with 100% on HOLD..............I hope that my query makes sense to somebody.
After all my teething probs I eventually hunt down most of the answers, and it's always nice to know that there has always been somebody else with the same probs before me at least.
This is my first post on here, but have been lurking in the background for some time trying to figure things out for myself and reading posts that are helping me in my struggles.
My query is this......when setting up the thro curves and pitch curves, I set the values as described, eg 0%, 20%, 40% etc for postion 1 to 5, (Got that part)
Then I have to put the HOLD to 0. If the first point says that the pos L=0%, 2=25%, 3=50%, 4=75% and 5=100%.........Do I then have to click and set the position back to L so that the HOLD is back to 0%, or do I set the position to H.......THEN go to HOLD and return all the way back down to 0%?
So I suppose the shorter question would be.............Should the Norm show L for 0% or should it be set to H with 100% on HOLD..............I hope that my query makes sense to somebody.
After all my teething probs I eventually hunt down most of the answers, and it's always nice to know that there has always been somebody else with the same probs before me at least.


Comment