Hi all
Finally getting some time to do some build on the heli.... thought i'd setup the head for zero pitch etc since i've got all the bell cranks etc mounted...
I've inserted the pins in the frame, my crank to swash links are great and swash is level and locked... swash driver is in place and driving correctly and level but my swash to grip links are having to be made MUCH shorter than the manual to make zero pitch.
Manual says 50mm but i'm needing to do them at 46-47mm to get the grips level. Am i missing something?
I've got the head jesus bolt in the bottom hole in the head so its at its highest... main gear jesus bolt is similarly placed to give most length to head
Attached a pic.... are shorter lengths ok?
Thanks o illustrious Fusion experts
J
Finally getting some time to do some build on the heli.... thought i'd setup the head for zero pitch etc since i've got all the bell cranks etc mounted...
I've inserted the pins in the frame, my crank to swash links are great and swash is level and locked... swash driver is in place and driving correctly and level but my swash to grip links are having to be made MUCH shorter than the manual to make zero pitch.
Manual says 50mm but i'm needing to do them at 46-47mm to get the grips level. Am i missing something?
I've got the head jesus bolt in the bottom hole in the head so its at its highest... main gear jesus bolt is similarly placed to give most length to head
Attached a pic.... are shorter lengths ok?
Thanks o illustrious Fusion experts